One should start with Section-A and finish it in time i.e. 13*7 = 91 minutes to have about 90 minutes for Section-B i.e. 6 Case Studies.
DDecode Civils
· 5 min read
How to Answer Ethics Case Study?
Time Management: One should start with Section-A and finish it in time i.e. 13*7 = 91 minutes to have about 90 minutes for Section-B i.e. 6 Case Studies. Thus, you have at max 15 minutes per case study.
Templates As Per Case Needs: There are generally 6 type of case studies that UPSC deals with. These are based on current affairs, public sphere, private sphere, law based etc. Gradually, I will discuss and share strategies for each type of case study.
Basic Case Study Format: While there is never a set answer for a case study, idea should be to learn from the basic format as under:
Actors or stakeholders of the case.
Dilemmas involved in the case.
May present gist of case or write current affairs background in the introduction.
Separate headings for the main answer body.
Answer in points rather than paragraphs.
Link keywords and theory wherever applicable: This is the most important aspect of case study and many forget to do it due to paucity of time and skill to interlink theory with a random case on the spot.
Diagrams as listed above.
Conclusion: Much like keywords and theories, conclusion is of utmost importance in case studies. Use way forward approach or present summary of the solutions provided by you and explicitly mention that your solution addresses each and every stakeholder and dilemma of the case.
Go through this answer to understand how I have applied above pointers:
CSM 2021Case 3: An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular state. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in the next two years by 30 June 2021, since the project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by the inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that a minimum of three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of the inspecting team on the ground that it was a minor crack that will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of the inspecting team and continue working with the same speed and tempo. He informed you that the minister does not want any delay as he wants the Chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is a far relative of the minister and he wants him to finish the project. He also gave you a hint that your further promotion as an additional chief engineer is under consideration by the ministry. However, you strongly felt that the minor crack in the pier in the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor. a) Under the given conditions, what are the options available to you as a project manager? b) What are the ethical dilemmas being faced by the project manager and his response to overcome such challenges? c) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges? d) What can be the consequences of overlooking the observation raised by the inspecting team?
Answer: Stakeholders involved in the case are Me (project manager), chief engineer, chief minister, inspecting team, minister, contractor, ministry, people etc.
a) As the project manager, there are a few options available in this situation:
Follow the instructionsof the chief engineer and continue the work without any delay, overlooking the observation raised by the inspecting team.
Stand by the inspection team's observation and halt the construction until the necessary repairs are made, which could delay the project by four to six months.
Seek a second opinion from an independent expert to assess the severity of the crack and make a decision based on their recommendation.
The project manager can also report the matter to the higher authorities in the government or the ministry, who can intervene and make a decision on the matter.
b) The ethical dilemmas faced by the project manager and solutions:
The conflict between duty and the pressure from the chief engineer to ignore the inspection team's observation.
Whether to prioritize the safety of the public over political pressures and personal gain.
Short term gain vs long term pain.
Political interest of inauguration before polls is undermining safety of people.
Chief engineer is compromising on integrity and not taking a just decision in line with Socratic Ideal Life/Person.
Conflict of interest on part of minister as contractor is his relative.
c) The professional challenges and solutions:
Professional competence and experience are at stake.
The risk of losing his job or being demoted due to his decision to halt the construction.
Face resistance and pressure from the contractor and the chief engineer, who have vested interests in completing the project without any delay.
Project manager must be firm in his decision and be prepared to provide a detailed explanation of his decision to the higher authorities.
Seek support from other professionals in his field and present a united front to ensure the safety of the public.
// Diagram
d) Overlooking the observation raised by the inspecting team:
Could have severe consequences for the safety of the public.
Could damage the project manager's professional reputation and integrity, which could have a long-term impact on his career.
Could result in legal consequences, as the project manager could be held responsible for any damages or loss of life caused by the collapse of the elevated corridor.
In conclusion, the project manager must prioritize the safety of the public over political pressures and personal gain. He must stand by his decision to halt the construction until the necessary repairs are made, seek a second opinion if necessary, and be transparent in his communication with all stakeholders involved. (// Conclusion)
Section-A generally includes 12-13 questions of 10-marks each amounting to 120-130 marks. These are to be answered in 150 words and 2 pages are provided to do the same. A 10-marker question shall be answered within 7 minutes. Questions are mostly analytical or at times…