PIB released a backgrounder on Small Hydro Power (SHP) after the approval of the SHP Development Scheme (FY 2026-27 to 2030-31).

Backgrounder on Harnessing Small Hydro Power

Harnessing Small Hydro Power

Why in News

PIB released a backgrounder on Small Hydro Power (SHP) after the approval of the SHP Development Scheme (FY 2026-27 to 2030-31).

News Summary

  • Outlay: ₹2,584.60 crore. Target: about 1,500 MW of new capacity.
  • Priority areas: hilly, North-Eastern and border regions.
  • Central support:
    • NE states and international border districts: ₹3.6 crore/MW or 30% of project cost, whichever is lower (cap ₹30 crore per project).
    • Other areas: up to 20% of project cost (cap ₹20 crore per project).
  • DPR support for at least 200 projects (₹30 crore set aside).
  • Expected outcomes: about ₹15,000 crore of investment and 51 lakh person-days of employment.

Prelims Facts & Static Linkages

ParameterSmall hydroLarge hydro
CapacityUp to 25 MWAbove 25 MW
Nodal ministryMNREMinistry of Power
Renewable statusAlways counted as renewableDeclared renewable in March 2019

Potential (as of 30 Sep 2026)

  • Total: 21,134 MW across 7,133 sites
  • Harnessed: about 5,182 MW (~25%)
  • Highest state potential: Karnataka (3,726 MW), then Himachal Pradesh (3,460 MW) and Arunachal Pradesh (2,065 MW), the largest in the North-East

Related concept: Pumped-storage hydropower. Water is pumped uphill when power is surplus and released through turbines at peak demand. It works as long-duration storage that balances solar and wind power.

Benefits and challenges

BenefitsChallenges
Decentralised power close to where it is used, so lower transmission lossesSeasonal swings in river flow
Needs no fuel and emits nothingDifficult terrain and access roads
Little land needed and little displacementHigh cost per MW and delays in clearances
Local jobs in remote and border areasWeak grid links in the North-East

Global link: hydropower is the world's largest source of renewable electricity. India's commitments under its updated NDC include 50% of installed power capacity from non-fossil sources by 2030 and the Panchamrit target of 500 GW of non-fossil capacity by 2030.

Likely Prelims angles

  1. The 25 MW threshold and which ministry handles which projects
  2. Run-of-the-river versus storage projects
  3. Which state has the highest SHP potential (Karnataka)
  4. Hydro projects India supports in its neighbourhood, such as Mangdechhu, Punatsangchhu and Chukha in Bhutan
  5. Small hydro means up to 25 MW and falls under MNRE.
  6. India has 21,134 MW of potential, and about a quarter of it is harnessed.
  7. Karnataka has the largest potential. Arunachal Pradesh leads the North-East.
  8. North-Eastern and border projects get support of 30% of project cost or ₹3.6 crore/MW, whichever is lower.
  9. Large hydro has been classed as renewable since March 2019.
  10. Hydropower Purchase Obligations (HPO) were added to the Renewable Purchase Obligation framework in 2019, so distribution companies must buy a set share of hydropower.

Practice MCQ

Q. With reference to Small Hydro Power in India, consider the following statements:

  1. Projects up to 25 MW are administered by the Ministry of Power.
  2. Run-of-the-river projects need large storage reservoirs.

Which of the above is/are correct? (a) 1 only (b) 2 only (c) Both 1 and 2 (d) Neither 1 nor 2

Answer: (d). These projects fall under MNRE, and run-of-the-river projects avoid large reservoirs.

Related PYQs

PYQ 1 (UPSC CSE Prelims 2024)

Recently, the term "pumped-storage hydropower" is actually and appropriately discussed in the context of which one of the following?

(a) Irrigation of terraced crop fields

(b) Lift irrigation of cereal crops

(c) Long duration energy storage

(d) Rainwater harvesting system

Answer: (c)

PYQ 2 (UPSC CSE Prelims 2025)

Consider the following statements about 'PM Surya Ghar Muft Bijli Yojana':

I. It targets installation of one crore solar rooftop panels in the residential sector.

II. The Ministry of New and Renewable Energy aims to impart training on installation, operation, maintenance and repairs of solar rooftop systems at grassroot levels.

III. It aims to create more than three lakhs skilled manpower through fresh skilling, and up-skilling, under scheme component of capacity building.

Which of the statements given above are correct?

(a) I and II only

(b) I and III only

(c) II and III only

(d) I, II and III

Answer: (d). All three match the scheme guidelines.

PYQ 3 (UPSC CSE Prelims 2026)

Match List I with List II and select the answer using the code given below the Lists:

List I (Project Supported by India)List II (Country)
A. Mangdechhu Hydroelectric Project1. Maldives
B. Restoration of Stor Palace2. Afghanistan
C. District Hospital at Dickoya3. Bhutan
D. Institute of Security and Law Enforcement Studies4. Sri Lanka

Code (A B C D):

(a) 1 4 2 3

(b) 3 2 4 1

(c) 3 4 2 1

(d) 1 2 4 3

Answer: (b)

Join Decode Civils Telegram Group For Free UPSC CSE Guidance From Mudit Jain, Ex-IPS, Ex-IRS

You can reach me at Instagram, LinkedIn, Twitter, Facebook, Youtube and Telegram.

Click Here to Learn More About

Decode Civils' UPSC Prelims 2027 Courses

Decode Civils' UPSC Mains 2027 Courses

Source: PIB Backgrounder

Downloads

0 comments

Discussion

Comments are read before they appear.

No comments yet. Be the first.

Preparing for UPSC?

Talk to us about the right programme for your attempt.

+91

By continuing, you agree to our terms & conditions.

Keep reading

Our programmes

View all courses →
Featured PYQ Edge
Prelims PYQ Edge

PYQ Edge

A PYQ mastery program: use PYQs to build an edge in your Prelims score

PYQ Edge Starts 15 Dec 2026

₹2,359 ₹2,949

Learn More: PYQ Edge