Semicon 2.0 Portal Opens and 12 More ECMS Approvals
On 6 November 2026, Union Minister Ashwini Vaishnaw launched the Semicon 2.0 Web Application Portal under the Semicon India Programme
DDecode Civils
· 3 min read
Semicon 2.0 Portal Opens and 12 More ECMS Approvals
Why in News
On 6 November 2026, Union Minister Ashwini Vaishnaw launched the Semicon 2.0 Web Application Portal under the Semicon India Programme, opening applications for Pillars 2, 3 and 4. The Ministry of Electronics and IT (MeitY) also approved 12 more applications under the Electronics Components Manufacturing Scheme (ECMS).
News Summary
Semicon 2.0 has a fiscal outlay of ₹1,27,500 crore under the India Semiconductor Mission (ISM), with six pillars: chip design, machines and materials, more fabs, ATMP/OSAT, R&D and talent.
Semicon 1.0 record:12 projects in six States with investment over ₹1.64 lakh crore. Five had started commercial production by October 2026.
Under the Chips to Startup (C2S) programme, 332 institutions got EDA tools and 70,000 students were trained.
New ECMS approvals:12 projects, ₹7,503 crore investment, ₹39,045 crore projected production and 7,127 direct jobs, across 7 States.
First-time ECMS approvals came for copper foil, cathode active material and specialty ceramics.
Cumulative ECMS:118 applications, 34 products, 16 States, ₹77,051 crore investment, ₹5,73,146 crore production and 81,755 jobs. Nearly half of the approved units are MSMEs.
Prelims Facts & Static Linkages
About ECMS
Approved by the Union Cabinet in March 2025 with an outlay of ₹22,919 crore over six years.
It targets components, not finished devices: bare components (such as multi-layer PCBs, relays and heat sinks), supply chain inputs (copper foil, anode and cathode materials, polypropylene film) and capital goods.
Incentives can be turnover-linked, capex-linked or a hybrid of both, and are tied to employment targets.
The goal is to move from assembly to domestic value addition and cut import dependence.
Key terms
Term
Meaning
Fab
A plant that makes chips on silicon wafers
ATMP / OSAT
Assembly, Testing, Marking and Packaging; Outsourced Semiconductor Assembly and Test
EDA tools
Electronic Design Automation software used to design chips
Copper Clad Laminate (CCL)
Base material for PCBs, made with copper foil
Cathode active material
Key input of lithium-ion cells
Why components matter
Phones and laptops assembled in India still rely heavily on imported components, so domestic value addition stays low.
Components such as PCBs, relays and capacitor films are used across electronics, automobiles, power and defence, so making them at home strengthens many sectors at once.
Upstream materials like copper foil and cathode active material also feed lithium-ion battery manufacturing.
A strong component base helps supply chain resilience when global shipments are disrupted.
Semiconductor policy timeline
December 2021: Semicon India Programme approved with ₹76,000 crore. ISM set up as a division of Digital India Corporation.
2022–2025: fabs and OSAT units approved in Gujarat, Assam, Uttar Pradesh, Odisha and other States.
March 2025: ECMS approved.
2026: Semicon 2.0 approved; applications open for Pillars 2–4.
Likely Prelims angles
Matching semiconductor plants with States.
The meaning of OSAT, ATMP and fab.
What ECMS covers and how it differs from PLI for finished goods.
Quick Revision
The Semicon 2.0 portal opened for Pillars 2, 3 and 4.
Semicon 2.0 outlay is ₹1,27,500 crore under ISM.
12 new ECMS approvals bring the total to 118 across 16 States.
First ECMS approvals for copper foil, cathode active material and specialty ceramics.
ECMS has an outlay of ₹22,919 crore.
Practice MCQ
Q. With reference to the Electronics Components Manufacturing Scheme (ECMS), consider the following statements:
1. It mainly supports the assembly of finished smartphones and laptops.
2. It offers turnover-linked, capex-linked and hybrid incentives.
3. Copper foil and cathode active material have been approved under the scheme.
Which of the statements given above is/are correct?
(a) 1 and 2 only
(b) 2 and 3 only
(c) 3 only
(d) 1, 2 and 3
Answer: (b). ECMS supports components, sub-assemblies and their inputs, not finished devices.
Related PYQs
PYQ 1 (UPSC CSE Prelims 2026)
Which one of the following pairs of semiconductor plants in India and their locations is not correctly matched?
(a) CG Power and Industrial Solutions Pvt. Ltd. in partnership with Renesas Electronics and STARS Microelectronics : Gujarat
(b) Tata Semiconductor Assembly and Test Pvt. Ltd. : Assam
(c) HCL-Foxconn Joint Venture India Chip Ltd. : Madhya Pradesh
0 comments
Discussion
No comments yet. Be the first.